upvote
Interesting that the recovery (edit: of load graph) is going at relatively steady 600 MW/hour, it will be a while if the pace continues the same way.
reply
Almost certainly being coordinated at that rate by adding one plant at a time, then a load region, then checking stability is holding, and so on.
reply