I hate this term, and look forward to using it all the time.
As you have identified A wider right of way costs more.
Usually for lines above some voltage, perhaps 200kV, the cost of an outage due to a tree strike outweighs the cost of additional vegetation management so they will clear the right of way wide enough that no tree can fall and hit the power line.
Around here for 130kV the right of way is still as narrow as it can be and we annually take down the riskiest trees as this is the best for our budget, which is not unlimited.
They go through and remove damaged trees near the easements of the highway lines, as well as branches that could break into lines.
As an aside we lived on the same section of grid as the sheriff, and our power was rock solid for a few years, then he left office and now our power is better than average (at least better than our neighbors who's power line cones from the other direction).
Residential distribution voltage varies by utility but it’s usually in the medium voltage range, 5kV to 35kV, with 13.8kV being common.