Why is it bad if some industrial users of electricity buy fields around their factories and set up their own power generation there instead of hooking up to the power grid?
reply
> industrial users can just buy the fields or hills around their factories and put up panels or wind turbines rather than negotiate with a bunch of entities.

Domestic users can just do the same. Some of us already have.

Yes, it’s not alway possible but a huge portion of domestic usage can be covered with a small install. Payback 5-10 years.

reply
I honestly don't see a big problem with that.

First: The same argument applies to suburban population, where autarky is even easier/cheaper than for industrial consumers: Just slap panels on the roof and a bunch of batteries into a shed, done. We won't even need much cheaper panels nor cells, really; it's mainly labor, integrator-margins and regulations that make this less (financially) attractive than the grid right now (pure cells are already in the $60/kWh range for single-digit quantities).

Second: If industrial consumers stop contributing towards electric grid costs and the general public dislikes it, you can just regulate against it, problem solved. But in practice governments already try to make the energy situation as appealing as possible for industry, so there is very little actually leveraged power that you really give up anyway.

reply
You're absolutely right it applies to suburbia too, not just rural areas and industry in rural areas.

> you can just regulate against it, problem solved

I think that is exactly what you'll lose the ability to do. If Marvin Heemeyer didn't need the town's septic connection we wouldn't know his name.

A huge fraction of regulatory enforcement exists in the gray area of "the government is wrong, or their enforcement of it is wrong but it's cheaper to bend over and take it than to fight it through a courtroom". If farmer Johnson can slap up a building kit on his property and power it with stuff he bought online and doesn't need the power company, Joe Schmo can do the same with an ADU. Yeah, they'll both get dragged through court but $50-100k of court costs to be proven right is a much smaller threat when the project can be done and generating income for the duration of the court case (it also renders the typical tactic of dragging out such cases much less effective).

And at a slightly larger scale, if some business interest can negotiate purely with a municipality to take over some disused factory and bring it back into use and get their power via bunch of panels and not get bogged down with state permitting to get a transmission line and substation the state loses a huge number of levers over the business interest and also they lose levers to control poorer municipalities (who'd happily take the business). Once again, they'll get dragged through court by the state, but spending 5yr and $200k just to be right isn't a dealbreaker when your widget factory has been operating the whole time.

Yes, of course governments can do worse things if they feel like it, but they run into problems of political optics and will more or less instantly.

You already see this kind of thing in some of the highest cost areas. Certain demographics in the greater NYC area often do building and land development things this way. It costs the same at the end, but by doing it without asking you get to use it while the whole process runs.

reply
The electrical utility DTE, in Michigan, required Google to do this for their new datacenter ("Project Cannoli") to avoid increasing consumer energy prices. They are building solar and battery storage to serve the load, as it is the cheapest and fastest new generation that can be built.

I see nothing wrong with power users committing to clean energy and storage to accelerate their development plans, or to allow them at all. I am unsure who is going to complain about this model. Lease or buy as much land as you need to deploy clean energy.

https://blog.google/innovation-and-ai/infrastructure-and-clo...

Regulatory filing: https://mi-psc.my.site.com/s/case/500cs00001amKTrAAM/in-the-...

> Google’s data center operations will be served by 2.7 gigawatts (GW) of new resources for the grid, including solar power, advanced storage technologies and demand flexibility. This Clean Capacity Acceleration Agreement with DTE (the same structure as the Clean Transition Tariff) will bring new, clean resources online, while supporting the state’s transition away from coal-fired power. As part of our standard approach to building new data centers, Google will fully cover its electricity costs and infrastructure needs, helping to ensure that its growth protects local ratepayers and actively bolsters the long-term resilience of the state’s electricity grid.

reply