upvote
Can you point to large scale solar or wind projects that were shoved into places that have extended periods of low sunlight or wind?
reply
The entire Energiewende for example.
reply
Are you saying that they chose bad locations inside of Germany for wind and solar or that Germany doesn't have any viable locations and they shouldn't build wind and solar in Germany at all?
reply
germany is producing tons of solar energy though?

can you be more specific and give 10 examples of german solar plants that produce ~0W electricity in a year?

they might be a lot more productive than you think

reply
Germany is producing some solar energy. This is of course indisputable.

They paid for that by selling most of their industry to China because energy costs became unbearable.

Was this the right tradeoff?

reply
Without that solar / wind, Europe would be paying 100 million euros per day more for LNG. Electricity in Europe is expensive enough already, making it even more expensive by shunning the cheapest available form would be even harder on industry.
reply
And if Germany did not phase out nuclear, EU would not have relied on russian LNG for so long.

But we live in an imperfect world.

reply
Prematurely phasing out 10GW of nuclear electricity is a drop in the bucket compared to LNG usage. A mistake, but a minor one.
reply
Axing the whole nuclear generation was a disaster.How many GW were not even planned, not to mention built in all those years? And don't try to slide out on "nuclear build-out takes too much time". It does not if there is a will.
reply