It's also less clear what a lot of their metrics mean. Does Cost per Task include only things that can be verified to work and passed? As best I can tell, it does not.
I'm less concerned if one model's cost per task is $0.10 and another model's cost is $1.50 if the $0.10 task got it right 1% of the time and the $1.50 model got it right 66% of the time.
An equalized / weighted cost/time per task is much more valuable - being massively penalized for taking a lot of time and ultimately not passing when OTHER models did pass.