PZB is only used up to 160 kph, and relies on wayside signals being read by operators. That's not possible on a high speed line. A more sophisticated signal system is simply necessary here.
I was only talking about the general problem domain, not about this specific location. The current safety system is also not was has caused this, likely. Or rather it has caused this by it's availability, not by it's safety.