How many data centres can you name that use wind turbine and solar panels instead of a grid connection?
Every single data centre above uses a grid connection.
Also, pasting walls of text does not meaningfully advance a discussion. This is just a poor appeal to authority.
Company builds datacenter that needs 2GW and a solar/wind/battery farm that produces a steady 2+GW then wires them together
And
Company builds datacenter that needs 2GW and a solar/wind/battery famr that produces a steady 2+GW and wires both datacenter and generation into the grid?
The later is what the wall of text is demonstrating.