I think because the grid connections would be uneconomical. These sites tend to be somewhat remote, and you'd need significant transmission lines to feed back the amount of power generated, which would ultimately be obsolete once the well was dry. (And just using it to power the oil operation itself wouldn't use enough power to be worth it or to use up the flare gas.)

But if you can relatively cheaply set up a large consumer on site, then it makes sense. I wonder if we could do mini data centers like this.

reply
So the math usually breaks down that as expensive as power is for a data center, having equipment idling is even more expensive.

We've had many talks over the decades about people moving server load around from areas of high power cost and/or temperature to areas of low cost and/or temperature based on live tracking, but every time someone has showed me the math that it's not even close to economical.

Then add the extra complication in the US of CAPEX versus OPEX, which I still don't understand why we've made it so complex, as it seems to completely eliminate some business models.

reply
What are the fundamental differences between data center and crypto workloads that makes it work for the latter but not the former? I guess the former would need better network infrastructure, for one thing. But both seem like they should be fairly similar on the CAPEX vs OPEX front, no?

I'm also not sure the associated gas from oil wells is actually that intermittent? I think at least in some cases it can produce power pretty consistently. Just not forever.

reply
There are different kinds of stranded power. A gas flare has, I presume, an expected average rate of production per day and if that is either stable or you provide a reservoir, you can install enough hardware to consume the median output, and then cross your fingers it will be depreciated before the well is exhausted. Not knowing much about wells (mostly only as pertains to GG emissions), I can't say if that's likely or virtually guaranteed, but I think we can deduce it's at least very likely, since it's already being attempted.

Then there's stranded solar and wind, and hydro, where either the grid cannot use the current power, or the transmission lines aren't rated to handle peak power. Those would all idle your equipment quite often, particularly in the case of peak shaving. Or conversely, if there's a power station you want to run as base load and keep running even when demand sags, and so you get a discount based on the cost difference between the producer's other options.

Perhaps some day we will have a thermal battery that is sufficient to vary the power draw of a datacenter by banking or expelling heat on a cost/benefit basis, but the heat pumps are only a fraction of the total power draw, so getting more than a 25% discount on net power draw seems unlikely, and then subtract travel time for maintenance and administration, theft prevention, etc, probably doesn't work out.

reply
Do you want high voltage power lines next to your oil well?