Not really, at least, not without potentially taking a loss on the capital cost of new production capacity. The projected demand has to be durable enough to cover the cost of a new factory, or new machines.
I'm assuming that existing capacity is utilized as close to 100% as possible to meet current demand, since doing otherwise at these prices is just leaving money on the table.